Friday, 28 December 2012

Fencing starts

Holes for the fence were dug yesterday with the posts going in today. Good to see our land defined and Frankie's gang did a great job.


















Of course John and Frankie lent a hand.



We even got fresh coconut water thanks to one of the lads.








And I looked after the pool area at Vila Chaumieres :)

- Posted using BlogPress from my iPad
Location:Vanuatu

Wednesday, 26 December 2012

Christmas 2012

Arrived for two weeks holiday and staying on the opposite side of the lagoon at Vila Chaumieres - a lovely small resort (only 3 garden bungalows and 2 lagoon view rooms). Very quiet with no children and a fantastic restaurant over the lagoon.



View while relaxing on the deck of our room.















Breakfast over the lagoon.

- Posted using BlogPress from my iPad
Location:Vanuatu

Sunday, 25 November 2012

How nice is this ....

Foreshore trees finally removed ... with assistance from Frankie :)










Friday, 31 August 2012

Looking better ....

We have had some better luck with finding someone reliable to maintain the blocks ... thanks Frankie :)



Look at those paw paw trees!

Monday, 30 July 2012

First container lands ..


It will be stored on a property where there is more security than out on our land.  Next steps are for the trees on the foreshore to go and then the beach to be built ... we're progressing at a better pace now.


Here are our electricity meters placed slap bang in the middle of where the driveways for both blocks will be! The electricity pole is actually inside our land and on the boundary of the two blocks!  Ahh, gotta love it .

Sunday, 15 July 2012

Keep going....

Wet weather held us up for a while as the trucks couldn't get in to deliver the windows, but finally we were able to continue.  Deadline was looming for the container to be shipped, so it was full steam ahead for quite a few weekends.
Fencing in!
Windows in!

 John in!


 See I did help ... I put the number stickers on!

Phew, all done and ready for collection.

Saturday, 16 June 2012

Let's get moving ....

Time to start packing our first container!
We had stored most of our "stuff" in a spare container at a local truck stop managed by a friend so this made our storage over the past year or two so much easier.

So together with the new deliveries such as kitchens, vanities, windows, bathroom fittings, electrical wiring, toilets and even down to nuts and bolts, the loading started.  Goods already stored had to be removed so we could pack in some sort of order.

Fencing for the four blocks


Believe it or not, these are the kitchens!  (No, we haven't gone crazy with colour, we packed the materials for the silt screen around for protection).  The silt screen will be used in the water to protect the environment when reclaiming the foreshore.


Monday, 21 May 2012

Building begins .....

Don't get excited, just the container house stumps.  John arrived in Port Vila to put the concrete stumps in to support the two container houses.  

Mmmm, doesn't seem to be much happening?



Done, stumps are in, just need the empty container to go in now.

Tuesday, 3 January 2012

Getting closer ......

Spent two weeks at Ifira Point ... amazing spot so close to town.




Land is looking good and we now have someone to permanently maintain it. 










Mmmmmm .....